Teaching and learning resources for the construction industry with NVQ and Diploma Assessment Criteria
Unit 206 Construct cavity walling forming masonry structures
The aim of this unit is to provide the learner with the
knowledge and skills to construct walling to form masonry structures
The learner will:
1. understand how to plan and select resources for practical tasks
The learner can:
It’s people talking to other people having a chat or making a speech, or telling them the way to the station.
And people talking means other people listening.
And it’s people writing to other people – in a letter or a magazine, or in a memo at work.
And people writing means other people reading.
You will notice when working on-site that in certain areas of construction, more than one trade has to work alongside one another.
It is very important that trades co-operate with each other.
This will ensure . . .
A good team spirit within the disciplines.
The completion of a project on time.
Less wasted or idle time.
Better use of plant and equipment.
On a construction site by report inaccurate information to my supervisor, this will be face-to-face, if he or she was not on site then you would have to phone up my supervisor and talk to them about the information.
if I was unable to contact my supervisor I would go to the next person in charge which would be my foreman or the site agent.
If there was inaccurate information on a working drawing I would take it to site agent to have a look and get him to admen the working drawing and sign and date on the working drawing or specifications.
How would you report inaccurate information and on construction site?
On a construction site by report inaccurate information to my supervisor, this will be face-to-face, if he was not on site I would phone up my supervisor and talk to him about the information if I was unable to contact my supervisor I would go to the next person in charge which would be my foreman or the site agent.
If there was inaccurate information on a working drawing I would take it to site agent to have a look and get him to admen the working drawing and sign and date on the working drawing or specifications.